there was a complaint at Hangar05 about alarm ringing but there was no fire. so we went with mr Maswan there to check if there was anything..then muted the alarm.

later in the evening, we followed vendor, ANE Engineering guys to the Hangar05 again, and check on the lighting that was reported to be faulty since long..so they checked and found out that the fuse in the lighting system. yes the system is a bit different from the ordinary ones..they want to keep the cost low so they use bus bar to lessen the amount of cable used. so to protect the lamp, they used fuse. so in this case, since the department need the fault to be repair asap..so they just do looping to the other circuit that are in good condition and make it in series.