we went to the Cargo Village with Mr Megat to check the list given by Mr Shahar. Actually the list was given by contractor appointed to made good the fire-fighting system in the village, so we as the maintenance people need to check whether the list are tally with the real defects in the place. such as the nozzle, GI pipe and hose.
the check list were done in all 4 cargo buildings. supposedly we also need to check the engineering department but we postponed due to lack of time and other works~